![NABRAWIND TECHNOLOGIES on Twitter: "Thirdly, the Anchor Rock foundation, for sites with bedrock close to the surface. It reduces an 80% the volume of concrete. Finally, the Multi Pile foundation specifically developed NABRAWIND TECHNOLOGIES on Twitter: "Thirdly, the Anchor Rock foundation, for sites with bedrock close to the surface. It reduces an 80% the volume of concrete. Finally, the Multi Pile foundation specifically developed](https://pbs.twimg.com/media/Eu-bFJfXAAIimET.jpg)
NABRAWIND TECHNOLOGIES on Twitter: "Thirdly, the Anchor Rock foundation, for sites with bedrock close to the surface. It reduces an 80% the volume of concrete. Finally, the Multi Pile foundation specifically developed
![Different alternatives for the installation of ground anchor and the... | Download Scientific Diagram Different alternatives for the installation of ground anchor and the... | Download Scientific Diagram](https://www.researchgate.net/publication/312151523/figure/fig4/AS:739947887734784@1553428732104/Different-alternatives-for-the-installation-of-ground-anchor-and-the-configuration-of.jpg)
Different alternatives for the installation of ground anchor and the... | Download Scientific Diagram
![Anchor Bolt / Pedestal / Foundation Connection - Structural engineering general discussion - Eng-Tips Anchor Bolt / Pedestal / Foundation Connection - Structural engineering general discussion - Eng-Tips](https://res.cloudinary.com/engineering-com/image/upload/v1566579128/tips/Ftg_Elev_pl19wg.png)
Anchor Bolt / Pedestal / Foundation Connection - Structural engineering general discussion - Eng-Tips
![Applied Sciences | Free Full-Text | The Behavior of a Thread-Bar Grouted Anchor in Soils from Local Strain Monitoring Applied Sciences | Free Full-Text | The Behavior of a Thread-Bar Grouted Anchor in Soils from Local Strain Monitoring](https://www.mdpi.com/applsci/applsci-10-07194/article_deploy/html/images/applsci-10-07194-g001-550.jpg)
Applied Sciences | Free Full-Text | The Behavior of a Thread-Bar Grouted Anchor in Soils from Local Strain Monitoring
![After the pour, we set our girt anchors to plum, aligned, and leveled. 15 piers in all, each directly under 15 6 x 6's… | Building a shed, Building a deck, Diy deck After the pour, we set our girt anchors to plum, aligned, and leveled. 15 piers in all, each directly under 15 6 x 6's… | Building a shed, Building a deck, Diy deck](https://i.pinimg.com/originals/97/49/8c/97498cb6cd7fda4c68baf749935fd4c7.jpg)